|
Date: |
|
Description: | After completion of initial piling, foundation and cable dragging operations, wind turbines are installed from a floating platform. The tower is first installed followed by a turbine nacelle pre-fitted with two blades. The third and final blade is lifted into position after the nacelle is secured. Each blade is 39 metres long, with workers completing operations at a height of 68 metres above sea level. | Subjects: | Wind Farm Aerial View Coastal Turbine | Source: | English Heritage - Viewfinder | Creator: | staff | Identifier: | http://viewfinder.english-heritage.org.u... | Language: | en | Go to resource |
|
|